We're redoing the hall bath and the first step was the flooring. This is what it looked like at 6:45 this morning when the tile guys arrived.

This is what it looks like with the new flooring.



I think the guys did a great job with the installation and I am very pleased with the tile.




Now I need to begin the process of removing the border, repainting the walls, hanging the new shower curtain and putting out my new towels (which I received for Christmas in anticipation of this project). In addition to the bathroom project, we are beginning to prepare for the new carpet installation and that will require moving everything, so I won't be able to tackle this project as quickly as I'd like. Still, it's a start.